TIS was contacted by a midstream pipeline client to abrasive blast a 42.5’ diameter diesel tank in Lincoln, NE. The tank was emptied, cleaned, and taken out of service due to API 653 10-year inspection requirements. The primary objective of TIS was to blast the interior surfaces, including the entirety of the floor and leave […]
Category Archives: Facility Maintenance
Description: On Wednesday August 19th, 2020 TIS mobilized a three-person crew to a manufacturing facility in Boulder, CO to perform maintenance on two storm water retention basins that had accumulated water-born algae and other solid material. TIS started the project by verifying the basin pumps were turned off, de-energized and locked out. TIS then went […]
Description: On December 6, 2019, TIS received a phone call from client management expressing an employee had tested positive for norovirus and wanted TIS to sanitize the areas where the employee was known to occupy. On December 7, 2019, TIS gathered equipment and materials and mobilized to the facility. TIS met with management personnel who […]
Description: A Class I Railroad contracted TIS to design and install a new Waste Water Treatment Plant (WWTP), in Shreveport, LA, for their locomotive repair facility. TIS was asked to disassemble the previous WWTP and then design and install the new treatment plant to fit within the existing footprint. The improved design needed to accommodate […]